Amptank

📍 Zug, Switzerland🗓 Founded 2021👥 3 employees💰 Last funded Nov 2025
From grid to GPU. AmpTank develops and operates integrated data center, battery energy storage (BESS) and compute infrastructure — the physical backbone of AI across Europe and Latin America. Our thesis is simple. In the AI era the binding constraint is not land, and it is not capital. It is firm, grid-connected power, delivered on a timeline you can build against. So we start where most developers finish. We secure grid access first, then build campuses where storage and compute share interconnection, land and civil works. The result is compressed time-to-power and a connection de-risked by design. And we dont stop at the shell. Through our compute platform we deliver GPU capacity and managed AI infrastructure on the campuses we build — capturing the full stack from interconnection to inference, rather than collecting rent on someone elses. We are a developer-operator, not a broker. We live with the assets we build: an operating, renewables-powered data center campus in the Nordics, and a development pipeline of integrated DC+BESS campuses in Brazil. Headquartered in Zug, Switzerland, AmpTank connects the two scarcest inputs of this decade — clean firm power, and the compute it makes possible. From grid to GPU.
1
Total investors
0
Early stage
1
Mid stage
0
Late stage
2021
Founded
Investor geography1 country
United Kingdom
1
Frequently asked questions
Who invested in Amptank?
Amptank has 1 investors on record on gritt.io, 1 mid-stage.
When did Amptank last raise funding?
The most recent investment in Amptank recorded on gritt.io was in November 2025.
When was Amptank founded?
Amptank was founded in 2021.
What industry is Amptank in?
Amptank operates in Energy Technology. Find similar Energy Technology investors on gritt.io.
Where is Amptank based?
Amptank is headquartered in Zug, Switzerland.